参考文献
第一章电力市场基本理论和第二章电力市场模式
[1] 于尔铿,韩放,谢开,曹方. 电力市场,中国电力出版社. 1998年4月
[2] A.F.Vojdani,C.F.Imparato,N.K.Saini,B.F.Wollenberg,H.H.Happ,“Transmission Access
Issues”,IEEE Transactions on Power Systems,Vol.11,No.1,February 1996
[3] 韩放. 电力市场研究. 哈尔滨工业大学博士学位论文. 1997 [4] 胡江溢. 电力市场初探. 上海交通大学博士学位论文. 1998 [5] 郏斌. 我国电力市场和电价理论研究. 西安交通大学博士学位论文. 1999
[6] E.Mansfield,Microeconomics:Theory/Applications,Ninth Edition,W.W.Norton,1997
[7] P.A.Samuelson,Microeconomics,Fifteenth Edition,McGraw-Hill,Inc. 1995
[8]
A
Mas-Colell,M.D.Whinston,J.R.Green,
Microeconomics,Theory,Oxford University
Press,1995
[9] R.J.Ruffin,Intermediate microeconomics,Harper Collins Publishers,1992
[10] 戴彦. 电力市场中的无功功率服务定价研究. 浙江大学博士学位论文. 2000
[11] A.K.David,“Dispatch Methodologies for Open Access Transmission Systems”,IEEE T
Transactions on Power Systems,V ol.13,No.1,February 1998
[12] IEEE,IEEE Tutorial:Risk Assessment and Financial
Management,IEEE Power
Engineering Society 1999 Winter Meeting,New York,1999 [13] W.J.Baumol,J.G.Sidak,Transmission Pricing and Stranded Costs in the Electric Power
Industry,The AEI Press,1995
[14] F.C.Schweppe,M.C.Caramanis,R.D.Tabors and R.E.Bohn,Spot Pricing of Electricity,
Kluwer Academic Publishers,1988
[15] 赵遵廉,辛耀中,郭国川. 电力市场营运系统. 中国电力出版社. 2001年1月
[16] Attendees Notebook, “Ancillary Services Workshop: Measurement and Costing of
Ancillary Services in Emerging Market Structures”,Held in Mami Florida by the Electric Power Research Institute, Palo Alto, CA, December 10-11,1997
[17] 李帆, 朱敏. 英国电力市场及输电系统简介. 电力系统自动化,1999,23(21)
[18] The Electricity Pool of England & Wales,http://www.doczj.com/doc/9c18056629.html,
[19] [20]
National R.A.Wakefield,
Grid
,
UK
,
http://www.doczj.com/doc/9c18056629.html,/uk/
H.D.Limmer,
D.J.LeKang,and
J.S.Graves,“Transmission Services Costing
Framework,”EPRI Report TR-105121-V1 and V2,Electric Power Research Institute,Palo Alto,CA,April 1995.
[21] K.N.Zadeh and R.C.Meyer,“Proceedings:Forum on Ancillary Services”,EPRI Report
TR-105686, Electric Power Research Institute, Palo Alto, CA, September 1995.
[22]
S.F.Szwed,
G.K.Luciano,D.C.Konieczkowski,
R.A.
Wakefield, D.J.LeKang,“Application of
EPRI’s Transmission Services Costing Framework to the Development of Open Access Transmission Tariffs,”EPRI Report TR-105971, Electric Power Research Institute, Palo Alto, CA, January 1996.
[23] D.Curtice,“Cost of Providing Ancillary Services from Power Plants,”EPRI Report
TR-107270-V1, Electric Power Research Institute, Palo Alto, CA, March 1997.
[24] P.J.Turner and R.J.Nicholls,“Cost of Providing Ancillary Services from Power Plants:
Reactive Supply and V oltage Control”,EPRI Report TR-107270-V3,Electric Power Research Institute, Palo Alto, CA, June 1997.
[25]
L.D.Kirsch,
D.Armstrong,
K.Driessens,
and
C.Herrera,“Survey of Unbundled Electric
Power Services”,EPRI Report TR-109461, Electric Power Research Institute, Palo Alto, CA, February 1998.
[26] E.Hirst and B.Kirby,“Electric-Power Ancillary Services”,ORNL/CON-426,
Oak
Ridge
National
Laboratory,
Oak
Ridge,Tennessee, February 1996.
第三章实时电价和相应管理
[1]于尔铿,韩放,谢开,等。电力市场。北京:中国电力出版社,1998。
[2] 戴彦,倪以信,文福拴,韩祯祥。电力市场下的无功电价研究。电力系统自动化,2000,
24(5)。
[3] 古祥祯,安乐定译,计算短期有功和无功电量边际成本,IEEE学报电力系统,1997,
12(2)。
[4] Y.Dai, Y.X.Ni, C.M.Shen,F.S.Wen, Z.X.Han, Felix F.Wu. “A study of reactive power marginal
price in electricity market”. Electric Power System Research 57(2001).
[5] Julian Barquin Gil,Tomas Gomez San Roman, Juan Jose Alba Rios, Pedro Sanchez Martin.
“Reactive Power Pricing: A Conceptual Framework for Remuneration and Charging Procedures”. IEEE Transaction on Power Systems.2000,V ol.15, No2.
[6] Y.Z.Li, A.K.David,Wheeling “Rates of Reactive Power Flow under Marginal Cost Pricing”.
IEEE Transaction on Power Systems. 1994,V ol.9,No3. [7] Jin Zhong, Kankar Bhattacharya, “Toward a Competitive Market for Reactive Power”. IEEE
Transaction on Power Systems. 2002,V ol.17,No4.
[8] Tom Parkinson, “Making Bilateral Competition Work”. [9] Harry Singh, Shangyou Hao, Alex Papalexopoulos, “Transmission Congestion Management in
Competitive Electricity Markets”. IEEE Transaction on Power Systems. 1998, Vol.13,No2. [10] M.I.Alomoush, S.M.Shahidehpour, “Generalized model for fixed transmission rights auction”.
Electric Power System Research. 54(2000).
[11] John D. Finney, Hisham A. Othman, William L.Rutz, “Evaluating Transmission Congestion
Constraints in System Planning”. IEEE Transaction on Power Systems. 1997, V ol.12,No3. [12] Thomas W. Gedra, “On Transmission Congestion and Pricing”. IEEE Transaction on Power
Systems. 1999, V ol14,No1.
[13] 方军,张永平,等。输电阻塞管理的新方法述评(一):—
—基于潮流的可交易输电权。
电网技术,2001,25(7)。
[14] 方军,张永平,等。输电阻塞管理的新方法述评(二):金融性输电权及与FGR之比
较。电网技术,2001,25(9)。
[15] Gabriel C.Ejebe, James G.Waight, Manuel Santos-Nieto, William F.Tinney. “Fast Calculation
of Linear Available Transfer Capability”. IEEE Transaction on Power Systems. 2000, Vol.15,No3.
[16] G. Hamoud, “Assessment of Available Transfer Capability of Transmission Systems”. IEEE
Transaction on Power Systems. 2000, V ol.15,No1.
[17] 刘俊勇,何迈。合理分配电网网损,提高电网经营管理水平。 [18] CAISO, “Report on CAISO operation”,1998,USA. [19]
A.J.Conejo,
J.M.Arroyo,
N.Alguacil,A.L.Guijarro.
“Transmission Loss Allocation: A
Comparison of Different Practical Algorithms”. IEEE Transaction on Power Systems.
2002,Vol.17, No3. 第四章辅助服务
[1] 温步瀛,周峰,程浩忠,俞健,高国鸣.电力市场备用容量支持服务研究.华东电力。2002
年第11期
[2] 谭伦农,张保会市场环境下的事故备用容量中国电机工程学报2002.11
[3] 王建学,王锡凡,张显,胡泽春电力备用市场的竞价模型2003.2
[4] 陈志姚,毕天姝,文福拴,倪以信,吴复立运用保险理论的备用容量辅助服务分散决
策机理初探电力系统自动化2002.20
[5] 赵学顺,余志伟,钟志勇,文福拴,钟德成,黄民翔基于高峰负荷定价理论的运行备
用获取和定价电力系统自动化2003.2
[6] 王建学,王锡凡,别朝红. 电力市场中的备用问题. 电力系统自动化. 2001.15
[7] 贺辉,姚建刚,欧阳永熙负荷参与备用市场的讨论电力系统自动化2003.7
[8] 任震,潘锡芒,黄雯莹,黄福全电力市场中计及发电机组可用率的备用分配计算电
力系统自动化2002.10
[9] Emilia Nobile, Anjan Bose. “A New Scheme for V oltage Control in a Competitive Ancillary Service Market”. 14th PSCC, Sevilla, 24-28 June 2002.
[10] J. P. Paul, J. Y. Leost and J. M. Tesseron, “Survey of the Secondary Voltage Control in France:
Present Realization and Investigation”. IEEE Transaction on Power Systems. Vol.PWRS-2, No 2, May 1987.
[11] S. Corsi, P. Marannino, N. Losignore, G. Moreschini and G. Piccini, “Coordination between
the Reactive Power Scheduling Function and the Hierarchical V oltage Control of the EHV ENEL System”. IEEE Transaction on Power Systems. V ol.10, No 2, May 1995.
[12] J. L. Sancha, J. L. Fernandez, A. Cortes and J. T. Abarca, “Secondary Voltage Control:
Analysis, Solution and Simulation Results for the Spanish Transmission System”. IEEE Transaction on Power Systems. V ol.11, No 2, May 1996.
[13] B. Kirby and E. Hirst, “Ancillary Service Details: V oltage Control”. Oak Ridge National
Laboratory, Energy Division, December 1997, available at
http://www.doczj.com/doc/9c18056629.html,/bridge. Restructured Power
[14] K.
Bhattacharya, M. H. J. Bollen and J. E. Daalder, “Operation of
Systems”. Kluwer’s Power Electronics and Power Systems Series, Kluwer Academic Publisher, USA, 2001, ISBN 0-7923-7397-9.
[15] S. Ahmed and G. Strbac, “A Method for Simulation and Analysis of Reactive Power Market”.
IEEE Transaction on Power Systems. V ol.15, No 3, August 2000.
[16] K. Bhattacharyr and J. Zhog, “Reactive Power as an Ancillary Service”, IEEE Transaction on
Power Systems. V ol.16, No 2, May 2001.
[17] Edson Luiz da Silva, Jonathan J. Hedgecock, “Practical Cost-Based Approach for the Voltage
Ancillary Service”. IEEE Transaction on Power Systems. V ol.16, No 4, Nov. 2001.
[18] Kankar Bhattacharya and Jin Zhong, “Reactive Power as an Ancillary Service”. IEEE
Transaction on Power Systems. V ol.16, No 2, May 2001. [19] F. L. Alvarado, “Methods for the quantification of ancillary services in electric power
systems”, Symposium of Experts in Electrical Operation Planning and Expansion, Recife, May 1996.
[20] “Methods and Tools for costing ancillary services”. In CIGRESC-38, Aug. 1999.
第五章发电厂竞价
[1] Francisco J. Nogales, Javier Contreras, Antonio J. Conejo, Rosario Espinola. “Forecasting
Next-Day Electricity Prices by Time Series Models”. IEEE
Transaction on Power Systems.
V ol.17, No 2.MAY 2002.
[2] G. B. Sheble, “Computational Auction Mechanisms for Restructured Power Industry
Operation”.Norwell, MA: Kluwer, 1999.
[3] J. M. Arroyo and A. J. Conejo, “Optimal response of a thermal unit to an electricity spot
market”. IEEE Transaction on Power Systems. V ol.15, pp 1098-1104,Aug. 2000.
[4] G. Gross and F. D. Galiana, “Short-term load forecasting”. Proc. IEEE,V ol.75, pp. 233-238.
[5] G. E. P. Box and G. M. Jenkins, “Time Series Analysis Forecasting and Control”, 2nd ed. San
Francisco, CA: Holden-Day, 1976.
[6] A. Pankratz, “Forecasting with Dynamic Regression Models”. New York: Wiley, 1991.
[7] B. R. Szkuta, L. A. Sanabria, T. S. Dillon. “Electricity Price Short-Term Forecasting Using
Artificial Neural Networks”. IEEE Transaction on Power Systems. V ol.14, No3, Aug 1999. [8] Vemuri V. R. and Rogers R.. D. “Artificial Neural Networks. Forecasting Time Series”. IEEE
Computer Society Press. 1994.
[9] VICPOOL. Victoria’s Competitive Electricity Market. Victorian Power Exchange (VPX). May
1995.
[10] NEM/VICPOOL. “Market Simulation Workshop”. Victorian Power Exchange(VPX). March
1996.
[11] VICPOOL Information Bulletin. V ol 4, No. 4. VPX. January 1997.
[12] Smith M. “Neural Networks for Statistical Modelling”. Van Nostrand Reinhold. New York
1993.
第六章电力市场展望
[1] Jiuping Pan, Yonael Teklu, Saifur Rahman. “Review of Usage-Based Transmission Cost
Allocation Methods under Open Access”. IEEE Transaction on Power Systems.2000,V ol.15, No4.
[2] J.I. Pérez-Arriaga,F. J. Rubio,and J.F Puerta Gutiérrez et al.,”Marginal pricing of
transmission services:An analysis of cost r ecovery”,IEEE Trans. on Power Systems,1995, V ol.10, No1..
[3] H. Rudnick,R. Palma,and J. E. Fernández, “Marginal pricing and supplement cost allocation
in transmission open access”, IEEE Trans action On Power Systems, 1994, V ol.10, No2. [4] Rudnick Hugh, Palma Rodrigo, Fernández José E. “Marginal Pricing and Supplement Cost
Allocation in Transmission Open Access.” IEEE Transaction On Power System, 1995, V ol.10, No2.
[5] Gedra Thomas W. “On Transmission Congestion and Pricing.” IEEE Trans. On Power System,
1999, Vol.14 No1.
[6] Yu C W, David A K. “Integrated Approach to Transmission Services Pricing.” IEE Proc.-
Gener. Transm. Distrib, 1999, V ol.146 No3.
[7] 姚建刚,秦红三,等。电力市场中输电与配电分开的方略初探。电网技术,V ol.25 No.3,
Mar. 2001。
[8] 刘亚安,管晓宏. 电力市场中购电商的市场分配问题研究. 中国电机工程学报. V ol.21
No.10, 2001.10。
[9] 马金明,秦雷鸣,等. 供电公司分时售电电价研究. 电力系统及其自动化. V ol.26 No.5,
2002.3.
[6] 文福拴,A.K.David. 加州电力市场失败的教训. 电力系统及其自动化. Vol.25 No.5,
2001.3.
[10] 林济铿,倪以信,吴复立。电力市场中的市场力评述。电网技术。V ol.26 No.11.2002.11。
[11] Scott M. Harvey and William W. Hogan. “Market P ower and Withholding”. 2001.10.20.
[12]Scott M. Harvey and William W. Hogan. “Market Power and Market Simulations”.2002.7.16.
[13]
Rajesh
Rajaraman
and
Fernando
Alvarado.
“(Dis)Proving Market Power”.2002.1.24.
[14] Kollin James Patten. “E valuating Market Power in Congested Power Systems”.1997.
[15] Richard E. Schuler.“Electricity and Ancillary Services Markets in New York State:
Market Power in Theory and Pra ctice”. the 34th Annual Hawaii Conference on Systems
Sciences, January 3-6 ,2001.
[16] Antonio C. Zambroni de Souza Fernando Alvarado Mevludin Glavic. “The Effect of Loading
on Reactive Market Power”. the 34th Hawaii International Conference on System Sciences –2001.
[17] Simon Ede, Timothy Mount, William Schulze, Robert Thomas, Ray Zimmerman.
“Experimental Tests of Competitive Markets For Electric Power”. the 34th Hawaii
International Conference on System Sciences – 2001. [18] 张少华,李渝曾,王长军,言茂松。结合期权理论的双边可选择电力远期合同模型。
电力系统自动化,2001,25(21):28-32
[19] 张少华,李渝曾,王长军,言茂松。电力市场中的远期合同交易。电力系统自动化,
2001,25(10):6-10
[20] 王宵雁,顾锦汶,宋燕敏,曹荣章,吴军。电力市场中的合同管理系统。电力系统自
动化,2002,26(5):13-16
[18] Roger Bjorgan, Haili Song, Chen-Ching Liu, Robert Dahlgren. “Pricing Flexible Electricity
Contracts”. IEEE Transaction On Power System Vol.15, No2. MAY 2000.
[19] T. W. Gedra, “Optional forward contracts for electric power markets”. IEEE Transaction On
Power System, V ol.9, No 4. Nov. 1994.
[20] Barbara Rehman. “CME-CIM Market Extensions.WECC MIC”. October 24/25 2002.
[21] “CIM Extension for Market Data Standards”. Power Delivery and Markets July 2002.
[22] “SMD: Questions and Answers.”
[23]Alice Fernandez, David Mead, Mark Hegerle. “United States of America Federal Energy
Regulatory Commission”. Docket No.RM01-12-000.
因篇幅问题不能全部显示,请点此查看更多更全内容